Cost Advantages

We offer a total lower installation cost compared to cable duct systems which includes field labor charges for the following:

  • Removal of covers
  • Partial assembly of supports
  • Pulling of cables
  • Cable interleaving
  • Lug attachment
  • Stress wrapping
  • Reinstallation of covers

Several installation cost advantages are included with our bus systems:

  • Factory assembled and shipped in lengths up to 24 feet to minimize field assembly labor.
  • Enclosure and bus joints are adjustable to accommodate normal size variations.
  • 5-15kV systems include removable boots for insulating shipping split bus joints. Push-in type fasteners are quickly installed reducing field insulation labor by 90%.
  • Optional cost advantages with heater monitoring system
  • No field drilling of enclosures or bus is required for standard assemblies.
  • Weather proofing is accomplished with adhesive backed, pre-cut gasketing eliminating the need for field applied caulking and sealants.
  • Enclosure assemblies utilize single wrench fasteners.
  • White insulators on 5 & 15kV applications to ease field maintenance and inspection.

Please select from below for more information

A Full Range of Standard Ratings & ISO 9001  

The Enclosure System

Cross Sectional Information  

Weatherproofing & Structural Support

The Bus Support System  

Grounding & Coordination of Equipment Interfacing

The Power Conductors & Joints System  

Cost Saving

Insulation System  

Paint, Product Testing & Options

Request Catalog / Sales Lit.  

Insulation and Bus Fabrication Services

Search Page

Contact Sales

Return to Home

Technibus

1501 Raff Rd. SW Canton, Ohio 44710 Fax: 330-478-8377